BOO PROJECT CENTRALIZED TREATMENT PLANT – JCSTP,
JAZAN ECONOMIC CITY
Jazan is located in the Kingdom’s southwest region, and in 2014 the Saudi Aramco Oil Company began constructing the Jazan Refinery and Terminal. The facilities form the industrial heart of the government’s greater Jazan Economic City project.
BOO PROJECT CENTRALIZED TREATMENT PLANT – JCSTP
During the time of construction the waste water needs to be treated. The centralized sewage plant JCSTP is designed to receive domestic waste water through tanker trucks from the camp of ARAMCO contractors. It has a design capacity of treating 5,400 m³/day.
MENA-Water provided the design, supply, installation and commissioning with start-up for the complete plant. The client for this project was FK & Partner Co.
Included in the scope of works there were tanker station, lifting pumps, screening, grit removal, aeration tanks and containerized MBR packages including all measuring instruments. Storage tanks for treated water and for sludge, including dry beds for sludge dewatering are completing the treatment. more Information
at Download
The entire plant is operated by PLC and observed through an online monitoring system 24h x 7d. Start-up was in October 2016.
Scope
Equipment | Application |
Screen | Screening removal |
Grit & Grease Trap | Sand , grease & FOG removal |
Mixer and Aeration System | Biological treatment |
MBR Package Plants | Filtration |
Blowers | Aeration and scouring |
Pumps | Flow control pumps and Service water pump |
Sludge Removal | Sludge drying beds |
Instrumentation | Flow, level (hydrostatic), TSS, DO, pressure control |
MCC and PLC | Complete auto control |
Generator | Power supply |