{"id":3283,"date":"2017-02-15T12:41:33","date_gmt":"2017-02-15T12:41:33","guid":{"rendered":"https:\/\/mena-water.eu\/en\/?p=3283"},"modified":"2019-03-25T12:51:45","modified_gmt":"2019-03-25T12:51:45","slug":"abu-arish-sewage-treatment-plant","status":"publish","type":"post","link":"https:\/\/mena-water.eu\/en\/projekte\/abu-arish-sewage-treatment-plant\/","title":{"rendered":"ABU ARISH SEWAGE TREATMENT PLANT"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignright\" src=\"https:\/\/mena-water.eu\/pictures\/AA-design.jpg\" alt=\"plant design\" \/>Abu Arish is a community located in south of KSA, part of Jizan Provence, close to the border of Yemen. Abu Arish has no sewerage network and waste water treatment plant. Before the new plant being built, tankers were discharging in a man made lagoon located approx 25 km away from the city. The STP location was chosen to be close to the lagoon.<\/p>\n<p>Abu Arish STP is is designed to receive municipal waste water by tanker discharge from the surrounding communities.  <!--more--><\/p>\n<div style=\"clear:both;\"><\/div>\n<p><img decoding=\"async\" class=\"alignright\" src=\"https:\/\/mena-water.eu\/pictures\/Tankerstation-Abu-Arish.jpg\" alt=\"tankerstation\" \/>MENA-Water provided the complete design, supply, installation, commissioning and startup for the whole plant 1,000 m\u00b3\/day<br \/>\nScreening, grit removal, lifting station, aeration and MBR, storage for treated water and storage for sludge including drying beds and measuring instruments were the comprehensive scope of works.<br \/>\nThe complete plant is operated by PLC and prepared for remote monitoring.<br \/>\n&nbsp;<br \/>\n<img decoding=\"async\" src=\"https:\/\/mena-water.eu\/en\/wp-content\/uploads\/sites\/5\/AAcamels_1600x600.jpg\" alt=\"site view\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Abu Arish is a community located in south of KSA, part of Jizan Provence, close to the border of Yemen. Abu Arish has no sewerage network and waste water treatment plant. Before the new plant being built, tankers were discharging in a man made lagoon located approx 25 km away &hellip;<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20,7],"tags":[25,30,29,24],"class_list":["post-3283","post","type-post","status-publish","format-standard","hentry","category-kommunalabwasser","category-projekte","tag-container-anlage","tag-mbr","tag-kommunal","tag-abwasser"],"_links":{"self":[{"href":"https:\/\/mena-water.eu\/en\/wp-json\/wp\/v2\/posts\/3283","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mena-water.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mena-water.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mena-water.eu\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/mena-water.eu\/en\/wp-json\/wp\/v2\/comments?post=3283"}],"version-history":[{"count":4,"href":"https:\/\/mena-water.eu\/en\/wp-json\/wp\/v2\/posts\/3283\/revisions"}],"predecessor-version":[{"id":3343,"href":"https:\/\/mena-water.eu\/en\/wp-json\/wp\/v2\/posts\/3283\/revisions\/3343"}],"wp:attachment":[{"href":"https:\/\/mena-water.eu\/en\/wp-json\/wp\/v2\/media?parent=3283"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mena-water.eu\/en\/wp-json\/wp\/v2\/categories?post=3283"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mena-water.eu\/en\/wp-json\/wp\/v2\/tags?post=3283"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}