{"id":610,"date":"2018-11-30T14:19:43","date_gmt":"2018-11-30T13:19:43","guid":{"rendered":"https:\/\/mena-water.eu\/minimbr\/?p=610"},"modified":"2019-02-15T14:26:32","modified_gmt":"2019-02-15T13:26:32","slug":"royal-guard-of-sultanate-of-oman","status":"publish","type":"post","link":"https:\/\/mena-water.eu\/minimbr\/royal-guard-of-sultanate-of-oman\/","title":{"rendered":"ROYAL GUARD OF SULTANATE OF OMAN"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignright\" src=\"https:\/\/mena-water.eu\/pictures\/RGO-MR1000.jpg\" alt=\"MR1000\" \/>The Royal Guard of Oman had designated MENA-Water for design, manufacture, build, supply, testing, commissioning and maintenance of a sewage treatment plant for AL Aman Camp Project. The project is located near Bait Al Barakah Palace, Muscat in Sultanate of Oman.<\/p>\n<p><strong>Package Plant<\/strong><br \/>\nRGO STP is is designed to receive domestic waste water by underground sewer. It has a design capacity of 1,000 m\u00b3\/day.<br \/>\nThe design is based on activated sludge sewage treatment process and build as package plant.<\/p>\n<p>MENA-Water provided the full design, supply, installation, commissioning, startup and operation &amp; maintenance for the complete plant.<br \/>\nThe scope of work was covering lifting station, screening, grit removal, aeration, MBR-system, tank for treated water and storage for sludge including sludge dewatering, odour control unit and measuring Instruments.<br \/>\nThe complete plant is operated by PLC and ready for remote monitoring.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Royal Guard of Oman had designated MENA-Water for design, manufacture, build, supply, testing, commissioning and maintenance of a sewage treatment plant for AL Aman Camp Project. The project is located near Bait Al Barakah Palace, Muscat in Sultanate of Oman. Package Plant RGO STP is is designed to receive&#8230;<\/p>\n","protected":false},"author":2,"featured_media":611,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[7],"class_list":["post-610","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mbr-projects","tag-mr1000-u"],"_links":{"self":[{"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/posts\/610","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/comments?post=610"}],"version-history":[{"count":1,"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/posts\/610\/revisions"}],"predecessor-version":[{"id":612,"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/posts\/610\/revisions\/612"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/media\/611"}],"wp:attachment":[{"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/media?parent=610"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/categories?post=610"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mena-water.eu\/minimbr\/wp-json\/wp\/v2\/tags?post=610"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}